Built for your industry, not for a catalog.
Every vertical runs wood and packaging differently. We build the program around how your dock actually works — specs in writing, delivery on our trucks, removal on every visit.
Medical & Pharma Distribution
Export programs bleeding on pallet costs. Odd-size platforms your vendor hates building. Five-week lead times on custom builds.
- Custom medical-logistics platforms — plywood-deck and odd sizes, currently supplying a major medical 3PL campus in Memphis
- All-plywood construction ships export ISPM-15-exempt — no stamp, no treatment delay
- Heat-treated solid-wood pallets and dunnage for stamped export lanes
- Standard lead of 5–7 business days from PO — not five weeks
- First-article approval before production; grade and build spec in writing
3PL & Distribution
Different specs for every client. Incumbents who won't pick up damaged pallets until a full truckload piles up.
- Multi-spec supply under one vendor — each client program on its own written specification
- Recycled Grade A and B at defined standards, new and custom builds alongside
- Damaged-pallet removal and core buyback on every delivery — partial loads included
- Scheduled drops matched to each building's receiving days
- Consumables — film, tape, labels, gloves — on the same truck and invoice
Steel & Export
Legacy dunnage pricing from distant suppliers. Weekly volume that can't miss a delivery.
- Dimensional dunnage — 2x4 through 4x4, standard and odd lengths, per piece and per truckload
- Assembled T-blocks and L-blocks built to your pattern
- Cut-off block bundles, banded and palletized
- Weekly standing deliveries on our trucks — local supply, not a 300-mile haul
- HT stamping through certified facilities when loads ship export
Manufacturing
Production that stops when wood doesn't show. A dozen supply vendors where one should do.
- New and custom pallets and skids built to your product's footprint
- Recycled programs for in-plant and captive-loop moves
- Crating and export packaging through qualified partners
- Supply programs sized to your build rate — replenishment before the shortage
- One invoice for wood, packaging, and floor consumables
HOW A PROGRAM STARTS
Send a photo of what's on your floor, your monthly volumes, and your current all-in price. Pricing comes back in two business days with the grade standard in writing. Most programs open with a pilot load or a 90-day trial site.